Tuesday, October 4, 2011

Some Progress to Report

There has been a little progress this past week other than playing with the blocks. I am to the point where I need to decide where and how to install electrical outlets in the addition. I've decided to run the power horizonally through the blocks instead of vertically through the cells.
It will be a lot easier to pull wires through conduit than try to fish wire through open cells in the blocks.

It;s a little hard to see but the first recepticle box is in along the north wall.

Maybe this is a little better perspective. At any rate the box looks a little high but the floor isn't poured yet, the recepticles will be at 16" above the floor, about 2" higher than NEC code. The large opening on the right will be an archway to a small porch in the front of the addition.

The south wall footer is finally in so the block work can get started on that. There is still a lot of digging to do. Barb has ordered that the excavated material be moved to the area she wants as raised beds in the garden, just another distraction.
Digger the dog.

Digger is getting more aggressive every day, I guess it would really be called possessive, I have to hunt for my shoes everyday now and she has learned to jump the creek. I suppose the next trick will be putting my tools and shoes in the creek. She really has a lot of fun running all over the place, she has started the growl and deep bark at unfamiliar sounds.

1 comment:

  1. I never see anybody using a visqueen plasic vapor barriers here, but then I see paint peeling from lower walls and I detect odors under the kitchen sink, etc. Do you think visqueen would help?